Possessions optimisation and digital engineering strategy
Fewer possessions. More output.
A smart planning console for optimising planned and reactive work to deliver more performance output through a smaller number of possessions.
Planning suite
Seven connected menus for possession-count compression
Move from asset criticality and degradation forecasts through work combining, possession packaging, resources, rehearsal, and digital job packs.
Network overview
Metro geospatial possession map
Criticality model
Asset criticality editor
| Asset | Failure mode | Criticality | Policy end-stop |
|---|---|---|---|
| TRK 5.8-7.2 | RCF propagation | Tier 1 | 18 days |
| PM CEN-24A | Detection drift | Tier 1 | 7 days |
| PSD CAM-02 | Door timing variance | Tier 2 | 35 days |
Condition intelligence
Intervention planner
- Grind L rail 5.46-6.20 km before RCF reaches re-rail trigger.
- Tamp and stoneblow R rail geometry defect 6.86-7.16 km within 21 days.
- Escalate wet-bed GPR signature for drainage inspection before next high-rain period.
Integrated workbank
Work combiner
T-90 to T-7 workflow
Possession packager
Maximise critical work density while preserving handback certainty and customer impact thresholds.
No re-railing in the same section as OHL work because the OHL RRV is not stable on unstressed rails.
Tamping clears before grinding enters the same linear footprint, with buffer and exclusion zones retained.
Readiness timeline
T-90 to T-1 package gates
Package readiness
Resource planner
Single possession simulation
Possession rehearsal
Rehearsal simulator
Selected possession sequence
Runs one possession package through isolation, work sequencing, verification, re-energisation, plant paths, and handback gates.
Field mobilisation
Digital job pack creator
Auto-assembled briefings, hazards, maps, permits, isolation diagrams, inspection forms, and handback certificates.
Field delivery
Digital handover and assurance
Condition triggers, FMECA criticality, and early candidate possession sets.
Graph traversal checks isolation footprints, engineering train paths, and shared sites.
Briefing packs, PLB locations, exclusion geofences, and worksite authority locked.
Digital infrastructure handover form closes hazards and restores train-ready status.